Домой GRASP/Korea Changi Airport Terminal 4 to hold open house from Aug 7

Changi Airport Terminal 4 to hold open house from Aug 7

335
0
ПОДЕЛИТЬСЯ

SINGAPORE: Changi Airport’s Terminal 4 (T4) will hold an open house for the public to get a sneak peek at the new terminal building from Aug 7 to 20. Prime Minister Lee Hsien Loong received a preview of Changi’s newest terminal during a tour on Friday…
SINGAPORE: Changi Airport’s Terminal 4 (T4) will hold an open house for the public to get a sneak peek at the new terminal building from Aug 7 to 20.
Prime Minister Lee Hsien Loong received a preview of Changi’s newest terminal during a tour on Friday (Jun 30) , he said in a Facebook post.
«I spent two hours getting a preview of T4 yesterday. Impressed by the modern design and automation that runs through the entire FAST clearance process, from self check-in, bag drops as well as immigration clearance, » he said.
«Impressed most of all by the dedication, creativity, and attention to detail of the team who did the project — well done to Civil Aviation Authority of Singapore and Changi Airport Group!»
Mr Lee added: “Passenger numbers have been increasing steadily, and T4 will help service this growing traffic.

Continue reading...